Line-Item Construction Budget Estimate |
|||||||
Based on National Averages |
|||||||
Enter only the “Total Direct Construction Cost” amount (do not include Lot, Overhead or Profit), and the worksheet will break out the phases based on the national average survey results. |
This information provides a quick glance at what you can expect for costs on the project.THIS IS NOT AN ESTIMATE FOR YOUR CLIENT. It is to use as a check on your estimating process. |
||||||
Project Finished Square Foot: |
Total Direct Construction Cost: |
||||||
Construction Cost per SF: |
|||||||
2.1 |
Site Work (sum of A to E) |
2.6 |
Interior Finishes (sum of U to AE) |
||||
A. |
Building Permit Fees |
U. |
Insulation |
||||
B. |
Impact Fee |
V. |
Drywall |
||||
C. |
Water and Sewer Fees/Inspections |
W. |
Interior Trim, Doors, and Mirrors |
||||
D. |
Architecture. Engineering |
X. |
Painting |
||||
E. |
Other |
Y. |
Lighting |
||||
2.2 |
Foundations (sum of F to G) |
Z. |
Cabinets, Countertops |
||||
F. |
Excavation, Foundation, Concrete, Backfill |
AA. |
Appliances |
||||
G. |
Other |
AB. |
Flooring |
||||
2.3 |
Framing (sum of H to L) |
AC. |
Plumbing Fixtures |
||||
H. |
Framing (including roof) |
AD. |
Fireplace |
||||
I. |
Trusses (if not included above) |
AE. |
Other |
||||
J. |
Sheathing (if not included above) |
2.7 |
Final Steps (sum of AF to AJ) |
||||
K. |
General Metal, Steel |
AF. |
Landscaping |
||||
L. |
Other |
AG. |
Outdoor Structures (Deck, Patio, Porches |
||||
2.4 |
Exterior Finishes (sum of M to P) |
AH. |
Driveway |
||||
M. |
Exterior Wall Finish |
AI. |
Clean Up |
||||
N. |
Roofing |
AJ. |
Other |
||||
O. |
Windows and Doors (inc. Garage Door) |
2.8 |
Other |
||||
P. |
Other |
||||||
2.5 |
Major Systems Rough-ins (sum of Q to T) |
||||||
Q. |
Plumbing (except fixtures) |
||||||
R. |
Electrical (except fixtures) |
||||||
S. |
HVAC |
||||||
T. |
Other |
||||||
TOTAL (rounded) |
|||||||