GARAGE DOOR SCOPE OF WORK

Objective of this Scope of Work

► To ensure that Garage Doors are installed in a manner consistent with all applicable building codes, manufacturer's instructions and warranty requirements, and acceptable construction practices.

Terms used in this document

►SITE SUPERINTENDENT: shall refer to any Company representative with authority to enforce this Scope of Work.
►SUBCONTRACTOR: shall refer to the Subcontractor's organization, its employees, or any representative of the Subcontractor assigned the authority to perform per this Scope of Work.

Acceptable Performance
Garage Door: General

► Garage doors are installed in all Company houses. Doors may be single or double depending on the plan.
► The type, size, make, and grade of garage doors is dependent on the plan. Once a type, grade, and make of garage door is selected by Company it may not be changed without the written permission of Company's purchasing agent.
► All installations shall be by trained, experienced personnel.
► Doors shall be installed per the manufacturer’s installation instructions and shall operate properly and smoothly.
► Doors shall be undamaged.

Garage Door: Installation

► Doors shall be installed level, plumb, square, and close tightly to the existing garage concrete floor.
► Installation shall not damage existing work and drywall.
► All springs shall be adjusted to ensure doors operate smoothly and correctly.
► Weather-stripping shall be installed per manufacturer’s instructions.
► Locking devices shall operate correctly and cause the door to be secure when locked.
► Garage door key(s) will be placed on a nail in the wall of the garage to the left of a single double-door or between two single doors.
► Garage door opener(s) must be placed at same location as garage door key.>
► All construction debris must be removed to the dumpster or to an area designated by the Site Superintendent.
► The job will not be considered complete and payment will not be issued until all trash and debris have been removed from the house and site.
► Garage shall be left clean and broom-swept.
► Correction of any items found on the final inspection report must be completed prior to payment being issued.