Manage your subcontractors from the Job Site

  • Have you ever been walking a job site after a subcontractor has just “finished” his work, and noticed some task that was left undone?  So, you grab a piece of wood, look around for something to write with, and wind up scratching yourself a note on a broken piece of OSB with a bent nail?  I have.
  • And you walk into your office with three or four stray pieces of wood, all with critical information etched on them, hoping you will be able to decipher it in the morning?  Yep.
  • And your receptionist looks at you kind of funny when you dump the pieces of wood on your desk?  Mine has.

If you have been checking out the Subcontractor Management Documents from Builder Resources, you know how important that quality checklist is for making sure everything gets done.  The problem has been making sure you had the right form with you at the right time.

Access isn't a problem any more.
If you have your phone, iPad, or laptop--
you've got the quality control tool you need.

See what the web-based version of the
Subcontractor Management System has to offer.

Quick Look

Detailed Look

Scopes of Work, Pre-Start Inspections and Exit Inspections are included for these phases:
  • Terms and Conditions
  • Scopes of Work
  • Work Order
  • Purchase Order
  • Excavation
  • Foundation
  • Framing Labor
  • Deck & Porch
  • HVAC
  • Plumbing
  • Plumbing: Slab-On-Grade
  • Electrical
  • Fireplace
  • Window & Exterior Door Installation
  • Roofing
  • Flatwork
  • Garage Doors
  • Stucco
  • Siding-Cornice
  • Brick Veneer
  • Stone Veneer
  • Shutters
  • Gutters & Downspouts
  • Landscaping
  • Insulation
  • Drywall
  • Painting
  • Finish Trim
  • Finish Trim – No Cabinets
  • Cabinet Installation
  • Countertop Installation
  • Stairs Finish
  • Floor Coverings
  • Mirrors & Shower Doors
  • Cleaning
  • ZERO Energy Ready Home exit inspection checklists
  • Energy Star exit inspection checklists
  • EPA Indoor AirPlus exit inspection checklists
  • WaterSense exit inspection checklists

(If you aren't a member yet, you can test drive the platform for the first month for only $4.00.)

SubManager
Monthly
Subscription

$ 4 First Month,
then $9.99/month
  •  

SubManager
Annual
Subscription

$ 99 Per year

  •  

SubManager
add seats
Monthly

$ 3 per seat 1st month,
then $4.99/seat
  •  

SubManager
add seats
Annual

$ 49 per seat
  •  
My Cart
0
Add Coupon Code
Subtotal